Acted as consultant for contract administration and claims.
Claims included cost claims, penalties or charges reduced, and delay damages avoided via EOTs.
350 M EGP || 24 M USD
Emaar MISR for Development, S. A. E.
Turner Consulting International (TiME)
Active Brains Innovative Engineering.
Kharafi National for Infrastructure Projects Developments – Construction and Services, S. A. E.
Package #88: Permanent Construction Works – Roads and Infrastructure -Road 1
– Section 1 B.
Package #103: Relocation Road 1 MV Cables & Telephone Cables and Road Zero
Utilities Diversion
Cairo, Egypt