Acted as consultant for contract administration and claims. Claims included cost claims, penalties or charges reduced, and delay damages avoided via EOTs.
Claims materialized into a settlement of 9M EGP (0.7M USD)
30 M EGP || 2 M USD
Emaar Egypt
Turner Consulting International (TCI)
Egyptian Consulting Group (ECG)
Gleeds, UK
E.MAK Contracting Company – Swimming Pool Centre
Package 83 (Design and Build of Village G – Swimmable Lake (Lagoon))
Claims Management and Contract Administration Consultant
North Coast, Egypt